Pit Design

The type of mining equipment to be used can have a considerable effect on the pit design. Details concerning what type of equipment to use and why is outside the scope of this manual. ... north and east. T he second phase of the pit design will be a push back to the south of the first phase design to excavate the material between Whittle Pit ...

Limiting Blast-induced Damage On Final Pit Walls | Agg-Net

A number of basic principles that can be applied to limit blast damage will be outlined in this paper, but first it is necessary to understand the mechanism of blast damage along final walls. BLAST DAMAGE MECHANISMS. There are several possible mechanisms that need to be considered, these being damage due to gas energy …

Selection of practical bench height in open pit mining …

Where, n is the number of push-backs i=1,2,…n, G i is the mean value of ore grade for push-back i, and is the xp ect d ma nv lu fo r g i y . Dilution T h eb n cig tal s omp v y f or ean dt hf, i lu b p ec isly tmad f ob n hg . T s tim a oncb dhr ug l n tro d uceby G lak . (2 0); w h, - i on fd l ut a resp c g v - z o ne s, cu t- f g r ad im l

Advanced Open Pit Planning and Design 2014 for NICICo …

By inputting known variables, volume of the water in the pit is 5.49x106 m3 Open Pit Mine Planning and Design 319 Method #3 Estimate volume by using Inventor Open Pit Mine Planning and Design 320 159 5/11/2014 Method #3 Estimate volume by using Inventor Open Pit Mine Planning and Design 321 Dewatering time • The disposal flow rate limit is ...

Delay time optimization in blasting operations for

The ill effects of blasting, i.e. ground vibrations, air blasts, fly rocks, back breaks, noises, etc. are unavoidable and cannot be completely eliminated but certainly minimize up to permissible ...

Research on production capacity planning method of open-pit …

To plan the production capacity of open-pit coal mines, according to the occurrence of each coal seam in the mining boundary (as shown in Fig. 1), this paper studies the influence of working face ...

Split shell open pit design concept applied at De Beers …

The split shell design does not significantly alter the size of the final pit shell nor does it reduce total tonnes mined—it is merely a re-schedule of intermediate cuts or push backs and is illustrated in Figure 4 below. Push-back /waste cut determination The correct push-back distance or waste cut is determined by

Pit Optimization for Improved NPV and Life of Mine in

The main aim of the study is pit optimization for improved NPV and life of mine in heterogeneous iron ore deposit. The aim was achieved by the following specific objectives: 2.0. Optimum pit analysis based upon NPV, life of mine, and operational suitability. Design of ultimate pit and carry out its financial analysis.

An Alternative Approach to Push-Back Design

push-backs derived from parameterization of the ultimate pit. However, the drawback of ultimate pit parameterization is that the pushback size may vary greatly. It is often the c- ase that a small push-back is followed by a very large push-back. This occurrence is generally referred to as the gap problem.

It's a matter of design—how pitfall trap design affects trap …

A recent meta-analysis by Brown & Matthews (2016) discussed many pitfall trap parameters (diameter, depth, colour, rain covers, preservatives and the use of funnels) and even proposed a standardized trap design. However, the authors did not consider additions to pitfall trap designs such as extended rim plates or guidance barriers …

Push Back Design in Two-element Deposits Incorporating …

Push back design as a complex task, is one of the major steps in the open pit mines planning. Push backs can be generated by varying economic factors such as commodity price, mining cost, processing cost, etc. Another important issue in generating push backs is grade uncertainty, which can cause the problem be more complex. Conventional …

Optimizing the number of open pit mine push backs

According to the findings, the optimum number of push backs has been proposed to be between three and six, as lower quantities of push backs are more likely to achieve the …

A PushBack Sequencing Model for Production Planning in Open-Pit …

Based on the seam model, a sequence of "geologically optimum push-backs" is generated in the final pit. The geologically optimum push-backs are then put into a dynamic sequencing model and ...

Optimizing the number of open pit mine push backs

In this paper, different algorithms have been implemented for the push back design of a cross section of a copper deposit and the results discussed. Moreover, the optimum number of push backs has been determined using analytical and multiple attribute decision making (MADM) methods based on minimizing the risk associated with grade …

Integrated open pit pushback selection and …

Abstract. Strategic mine planning for open pits has now evolved to the simultaneous optimization of a number of decisions and this leads to the consideration …

A new model for automated pushback selection

This paper is focused on the second stage, about pushback selection. The design of pushbacks is a key component for the long-term open pit mine scheduling …

A Novel Large-Scale Stochastic Pushback Design …

Picard demonstrated that adopting a minimal cut technique to a related graph can solve the maximum closure problem of open pit mine planning. The final pit …

New push back design algorithm in open pit mining, A

Push Back Design in Two-element Deposits Incorporating Grade Uncertainty (RESEARCH NOTE) Push back design as a complex task, is one of the major steps in the open pit mines planning. Push backs can be generated by varying economic factors such as commodity price, mining cost, processing….

ThreeDify

GeoMine QuickPit (QuickPit) is an advanced open pit design software for rapid pit design. QuickPit allows a mine planner to build a complete pit or dump design with ramps in minutes. Its parametric and incremental pushback/dump creation tools, combined with unlimited undo/redo, allow the mine planner to evaluate multiple designs and plans in ...

Compare Methods of Fix Lead, Milawa NPV and Milawa …

the pit and then choosing optimal pit and push backs and optimal strategic pro- duction scheduling with Whittle software and at the end, is sensitivity analysis and possible changes needed and ...

What are pushbacks and why do we really need them in open pit …

Pushbacks play a very crucial role in open pit mine design and optimisation. Production scheduling is based on the underlying set of pushbacks, so the manner and approach in which pushbacks are selected, designed, and scheduled have a remarkable impact mainly on the mine's profitability. I am going to demonstrate the importance of …

Push-backs in a final pit. | Download Scientific …

Suppose that a sequence of 5 geologically optimum push-backs within a geologically optimum pit F i has been generated as shown by p 1 to p 5 in Figure 2. A dynamic …

Integrated open pit pushback selection and production capacity

Strategic mine planning for open pits has now evolved to the simultaneous optimization of a number of decisions and this leads to the consideration of additional solutions, with the potential to add value to planning and reduce manual data transfer time. Unlike previous efforts, this paper outlines a method for simultaneously optimizing mining …

An Alternative Approach to Push-Back Design

push-backs derived from parameterization of the ultimate pit. However, the drawback of ultimate pit parameterization is that the pushback size may vary greatly. It is often the c- …

(PDF) Pushback design of open pit mines under geological …

The push–relabel minimal cut algorithm provides a framework for computationally efficient representation and processing of the economic values of mining blocks under multiple scenarios. ... phases or cut-backs these sections have the property that if removed in the appropriate order they obey the engineering slope requirements for the pit ...

An Alternative Approach to Push-Back Design

The final step in the prepar ation of the graph is the as ... push-back number fifteen has a gap of 150.83% meaning that ... Push-back design using ultim ate pit parameterization can experien ce ...

Optimizing pushback design considering minimum mining …

Final pit. Block model V alue Ro ck ... and the number of extracted blocks are presented. ... and K. Dagdelen. 1998. "A new push back design algorithm in open pit mining." In. Pro ce edings of ...

Modeling Study on Cumulative Damage Effects and Safety

Drilling and blasting method used for excavation causes damage to surrounding rock mass, and frequent blasting often leads to cumulative damage effects. Thus, understanding the distribution of Blast-Induced Damage (BID) zone is critical to assess the slope stability of open-pit mines. Herein, this study aims to investigate the …

Final Pit Design with All-Cut Ramp | Download Scientific …

Final Pit Design with All-Cut Ramp ... of the optimal pit back to Surpac for detailed pit design. In all, 55 nested pit outlines were generated but the one with the highest Net Present Value (NPV ...

Open pit optimisation using discounted economic block …

mining push-backs over the mine life. An intelligent agent interacts with the push-back simulator to generate an optimal push-back schedule using reinforcement learning. IOPS has been designed for long-term scheduling of large scale open pit mines. Traditional mine scheduling methods such as mixed integer linear programming focus on finding the

(PDF) Pushback Design using Genetic Algorithms

Effect of price on best valu e ... final pit design often depends on factors that are largely outside the mining en ... or design push backs with capaci ty constraint using genetic al gorithm in ...

Simultaneous Optimization of Final Pit and Production Schedule …

The geologically optimum push-backs are then put into a dynamic programming scheme and the best production schedule which has the highest NPV is obtained for each final pit. After the best production schedules for all the final pits are obtained, the one with the highest overall NPV is the optimum final pit and its associated best schedule is ...

A model for open-pit pushback design with operational …

Ramazan S (1996) A new push back design algorithm in open pit mining. Colorado School of Mines (PhD thesis) Tabesh M, Askari-Nasab H (2013) Open pit production planning using controled pushbacks and aggregates. In: 23rd World Mining Congress, CIM, Montreal, vol 2, pp 1–11. Wharton C, Whittle J (1997) The effect of …

Delay time optimization in blasting operations for …

1. Introduction. Xinqiao Mining Co., Ltd has an open-pit mine with 4 million ton Pyrites production p.a. At present, the final pit walls with about 200 m height have occurred.According to the mining project, the height of the slope will increase to 400 m or above when the open-pit mine will be closed.Pre-splitting blasting has almost not been …

Calculating ultimate pit limits and determining …

Here, we study the effect of a 16.7% drop in selling price to $2.5/lb (Fig. 14). As shown in the figure, phase 8 would no longer be profitable since the loss would be 14.9%, and neither would phase 7 since the loss would be 6.2%. Phase 6 would be …

Stochastic Simulation of Open Pit Push-backs with a

Function approximation of the discrete simulated push-backs provides the means to convert the set of partial differential equations (PDEs), capturing the dynamics of open pit layouts, to a system ...

(PDF) The impact of equipment productivity and pushback …

The open pit design and scheduling problem is a large-scale optimization problem that has attracted considerable attention during the last 40 years The development of the "know-how" to improve ...

أحدث المنتجات